100 tons of steel construction for airport/trade fair stop as part of S21
1
1

Around 100 tons of steel beams and steel structures for pipe and line suspensions

100 tons of steel construction for airport/trade fair stop as part of S21

Airport connection of the new Stuttgart-Ulm line

As part of the Stuttgart 21 project, a new long-distance and regional railway station is being built at the airport, including a tunnel to connect it to the new Stuttgart-Ulm line. The underground station Flughafen/Messe will have a length of 400 m and – just like the two single-track, 1.8 km long tubes of the airport tunnel – will be constructed using mining methods. At the beginning of 2020, SÜLZLE Nutzeisen supplied about 100 tons of steel girders and steel structures for pipe and line suspensions for this construction project. The prefabricated steel constructions for the underground long-distance railway station were installed by Markgraf Schweißfachbetrieb GmbH and the steel girders were professionally welded.

Facts and figures about the project:

100 tons

Steel beams and steel constructions

400m

long stop

1,8 km

long tubes

Location of the reference project “stop Flughafen/Messe” as part of S21

Flughafen/Messe

70629 Leinfelden-Echterdingen

Google Maps

By loading the map you accept the privacy policy of this website and Google
Privacy policy Google
Privacy policy of this website

Load map

REFERENCES